/
Synchronize Project Information.
Synchronize Project Information.
Project Information
Open the “Attribute Configuration Settings”
Select “Edit” beside the “Project information <->” configuration. Admin access is required to be able to edit the configuration
3. Link project parameters. Read more: Revit Attribute Configurations.
Examples of this include the Project Name, Areas, and Measurements.
4. Select “Close”
5. Select “Ok”
6. Open the “Synchronize” window in the ribbon
7. Tick the box “Synchronize project information”
8. Select Synchronize
Note: This must be done from the Rooms Module.
9. Go to Project Information in the Revit Manage Tab to confirm that the update has taken place.
Related content
Working with Multiple, Linked and Shared Revit Models
Working with Multiple, Linked and Shared Revit Models
Read with this
Link and Synchronize Finishes with Room Parameters
Link and Synchronize Finishes with Room Parameters
More like this
Track changes: Revit Rooms, Spaces and Areas.
Track changes: Revit Rooms, Spaces and Areas.
More like this
Create or Update Revit Rooms from Linked Revit Model
Create or Update Revit Rooms from Linked Revit Model
More like this
Create or Update Revit Spaces from Linked Revit Model.
Create or Update Revit Spaces from Linked Revit Model.
More like this
Create new Room or Room Template based on a Revit Room
Create new Room or Room Template based on a Revit Room
More like this