When both rooms and Item have been specified in detail, the correlation between these specifications can be checked by defining a set of rules. When an Item is entered for a room and this is governed by constructional requirements, the rules set up can check whether the room data sheet for this room meets the requirements. Say that 3 computers are to be placed in a room and all require power supply. If only 2 sockets have been set up in the room, then there is a probable error. If 30 sockets are set up in the room, and no other item in the room requires power, this is also a probable error. This is an example of a resource in the room you want to include, but other rules are also possible; for example, certain types of item may require a minimum/maximum temperature in the room in order to function properly, or require noise insulation as the item generates a lot of noise. 

The set-up of rules can be complex and is normally carried out by the project administrator.部屋とアイテムが詳細に指定されている場合、ルールを定義することで、これらの仕様の相関関係をチェックすることができます。ある部屋に対してアイテムが入力され、
そのアイテムが建築要件によって管理されている場合、設定されたルールによって、その部屋の部屋データシートが要件を満たしているかどうかを確認することができます。ある部屋に3台のコンピューターが置かれ、すべてに電源が必要だとします。もし部屋に2つのコンセントしか設置されていなければ、それはエラーであり得る。
もし部屋に30個のコンセントが設置され、他に電源を必要とするものがなければ、これも確率的エラーです。 これは、あなたが取り入れたい部屋のリソースの例ですが、
他のルールも可能です。例えば、ある種のアイテムが正常に機能するためには、部屋の最低/最高温度が必要であったり、そのアイテムが多くの騒音を発生させるため、
遮音性が必要であったりします。

ルールの設定は複雑な場合があり、通常はプロジェクト管理者が行います。