We are going to show you an example of how you can populate your Systems data using Revit, IFC or Excel and the process of populating all your Systems data in dRofus.  

Connecting dRofus and Revit using System Module 

There are numerous advantages to establishing a connection between dRofus and Revit using the Systems Module. To illustrate, we will provide some helpful examples in the Planning, Building and phases of a dRofus Project. 

Planning phase

In the planning phase, connecting Systems to Revit allows to automatically sync data. This means that any changes made in dRofus will automatically be reflected in Revit. The opposite will be true as well. 

...

The result of this connection is your teams can more easily share information across disciplines. For example, enhanced communication with the Engineers on a project. Since most Engineers are already maintaining their data in Revit (or a similar software) it become easier to ensure increased information sharing with you team members who maintain their data in dRofus.  

This allows for increased visibility around the selection and installation of an item, occurrence, and component, such as an air handling unit. Even though one team is responsible for delivering the object the team responsible for connecting it to the systems (electrical and ventilation) can see the required connections beforehand and anticipate the scope and any potential complication of installation. 

...

Building phase

In the building phase, Contractors responsible for placing an item or occurrence that is connected to a System will not need to rely on the drawings. They will be able to use dRofus to have a clear and accurate representation of installation. Additionally, Systems provide the ability to actively monitor the building status of a project. This means that an object, that is connected to multiple systems can be monitored by all disciplines involved. As a result, you can monitor the progress of other people’s work without having to visit the site. 

...

Maintenance phase

During the maintenance phase of a project the Facilities Management team will have everything in an instance of dRofus even before the project is complete. Of course, this will include all the log records from Revit and dRofus for all of the teams involved in the Planning and Building phases. This will assist in the ability to anticipate upcoming projects and work to scope and plan for them. Revit、IFC、Excelを使用してシステム・データを入力する方法の例と、
dRofusにすべてのシステム・データを入力するプロセスをご紹介します。

システム・モジュールを使用したdRofusとRevitの接続

システム・モジュールを使用してdRofusとRevitの接続を確立することには多くの利点があります。
ここでは、dRofusプロジェクトの計画、構築、および各フェーズで役立つ例をいくつか紹介します。

プランニング段階

プランニング段階では、システムをRevitに接続することで、データを自動的に同期することができます。
つまり、dRofusで行った変更は自動的にRevitに反映されます。逆の場合も同様です。

...

この接続の結果、チームはより簡単に分野を超えて情報を共有できるようになります。
例えば、プロジェクトにおけるエンジニアとのコミュニケーション強化。
多くのエンジニアはすでにRevit (または同様のソフトウェア) でデータを管理しているため、
dRofusでデータを管理しているチームメンバーとの情報共有が容易になります。

これにより、エアハンドリングユニット (air handling unit) のようなアイテム、オカレンス、
コンポーネントの選択と設置に関する可視性が向上します。 あるチームが納品を担当しても、
それをシステム (電気や換気) に接続するチームは、必要な接続を事前に確認し、
設置の範囲や複雑になる可能性を予測することができます。

...

建築段階

建築段階において、システムに接続されるアイテムやオカレンスの配置を担当する請負業者は、
図面に頼る必要がありません。彼らはdRofusを使うことで、インストールを明確かつ正確に、
表現できるようになります。さらに、システムはプロジェクトの建築状況を積極的に監視する機能を、
備えています。つまり、複数のシステムに接続された対象物を、関係するすべての分野から
監視することが可能になります。
その結果、現場に行かなくても他の人の仕事の進捗状況をモニターすることができます。

...

メンテナンス段階

プロジェクトのメンテナンス段階において、施設管理チームは、プロジェクトが完了する前であっても、dRofusのインスタンスですべてを把握することができます。もちろん、これにはRevitとdRofusの
ログ記録も含まれ、プランニングとビルディングのすべての段階に関与したチームのログが
記録されます。これは、今後予定されているプロジェクトを予測し、そのスコープと計画に取り組む能力を支援するものです。

...